Clean Energy Wyoming

Survey sheet no. 01, Wyoming wind country

The wind out here is not the problem. Moving it is.

Wyoming's ridgelines hold some of the best wind in the country, and the state already makes roughly a quarter of its electricity from it. The hard part is the outlet: one very long power line, one very large wind project, and a decade of waiting on both.

Illustrated high-plains horizon with a red sun over a blue ring, contour-line hills, and a row of wind turbines on the ridgeline
The divide at poster scale: turbines on the ridgeline, contours underfoot.
Rawlins to Sinclair, Carbon County Continental Divide, WECC West

Top Story

Reported this week
Topographic-style map illustration with contour lines, three ringed wind turbine markers, and the block numerals 3550
Contour country: the high ridges south of Rawlins where the Chokecherry and Sierra Madre project is rising, phase by phase.
The 732-mile outlet: Wyoming's wind is about to leave the state, and that is the point

A high-voltage direct-current line begun in 2023 is due to carry on the order of 3,000 megawatts from Carbon County toward the Desert Southwest around 2027. Pair it with the largest wind build in the country and you get the biggest story in Wyoming energy this decade. Here is what it means for county tax rolls, for construction jobs in Rawlins, and, yes, for your Rocky Mountain Power bill.

Read the story

Stories

From the sheets

Where Things Stand

Numbers we can point to
  • Share of Wyoming generation from wind, 2024

    Per the EIA state analysis, wind has more than doubled its share since 2019 even as coal remains the largest source by far.

  • Growth in Wyoming wind output since 2019

    On the order of 10 million megawatt-hours a year now, by EIA's count, up from roughly half that six years earlier.

  • Megawatts planned at Chokecherry and Sierra Madre

    The Power Company of Wyoming project south of Rawlins counts itself at roughly 3,000 to 3,550 megawatts across two phases, with major permits secured.

  • Miles of TransWest Express line under construction

    Direct-current line planned at about 3,000 megawatts, begun in September 2023, with the developer and the California ISO both pointing at a 2027 in-service window.

Illustrated data panel with banded contour terrain on the left and large block numerals 23 and 2X on the right
Two numbers to carry: roughly a quarter of the state's power is wind now, and the fleet has doubled since 2019. Both come from the EIA's Wyoming analysis.

How We Work

The house rules
  1. Primary sources only

    Grid operators, government agencies, utilities, and project companies. If a number cannot be traced to one of those, it does not run.

  2. Hedged numbers

    Schedules slip and estimates move. We write roughly and on the order of, and we say which document the figure came from.

  3. The bill is the story

    Every piece answers the reader's actual question: what does this do to my power bill, my county's budget, my ridge line?

  4. Corrections welcome

    Public dockets and agency pages are the record. When they change, we update and say so.